Home » Content » Isolation Room- Engineering and Design Requirements
×

Status message

This document is temporarily unavailable. A new version of this document is being uploaded and will be available within 24 hours.

Should you continue to experience issues with accessing this document please use the Ask a Question form.

A new AusHFG resource has been  developed entitled Isolation Rooms - Engineering and Design Requirements (Revision 1). This document has been developed to:

  •  provide an up-to-date resource to projects as it is anticipated that HB260 Hospital Acquired Infections - Engineering Down the Risk (2003) will be retired in the near future
  •  incorporate the lessons learned from recent projects.

The information has been developed with the input of a an expert group of health service and industry representatives. A thank you is extended to all those who have contributed to the development of this document.

Isolation Room- Engineering and Design Requirements
Published Status: 
Completion Status: 
Status: 
Under review